PROJECT 1 - Electrical Upgrade

Client: UnitedGroup
Project: 33KV Electrical Cable Upgrade at Berrima Cement Plant
Start Date: 08/05/2006
Completion Date: 12/05/2006

Scope of Works

Drill 205m and install 2 x 125mm Continuous Electrical Conduit Between the Railway Line and the existing table Drain inside the Berrima Cement Plant without disruption to the plants day to day operations.


Project Sensitivity

Existence of 11kv Electricity Cables, Large Table Drain, Railway Line. All construction was not to impact on the Cement Plants day to day operations. Work to strict OH&S Cement Plant guidelines at all times.


Mobilisation Entry hole Exact drill exit
Fuse lengths of bore pipe to ensure a 205m continuous conduit installation and prepare for pullback

Attach conduit to drill rod and commence pullback operations